Skip to content

docs: reposition project as MCP infrastructure #5

docs: reposition project as MCP infrastructure

docs: reposition project as MCP infrastructure #5

Triggered via push November 25, 2025 18:22
Status Failure
Total duration 45s
Artifacts
typecheck
41s
typecheck
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

6 errors
test (3.12)
Process completed with exit code 1.
test (3.11)
The strategy configuration was canceled because "test._3_12" failed
test (3.11)
Process completed with exit code 1.
test (3.10)
The strategy configuration was canceled because "test._3_12" failed
test (3.10)
The operation was canceled.
typecheck
Process completed with exit code 1.