Skip to content

Pull requests: openshift/sippy

Author
Filter by author
Loading
Label
Filter by label
Loading
Use alt + click/return to exclude labels
or + click/return for logical OR
Projects
Filter by project
Loading
Milestones
Filter by milestone
Loading
Reviews
Assignee
Filter by who’s assigned
Assigned to nobody Loading
Sort

Pull requests list

NO-JIRA: devcontainer fixes and improvements approved Indicates a PR has been approved by an approver from all required OWNERS files. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. ready-for-human-review Indicates a PR has been reviewed by automated tools and is ready for human review
#3511 opened May 7, 2026 by smg247 Member Loading…
TRT-2655: Add APM docs instruction rule for keeping docs up-to-date jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. ok-to-test Indicates a non-member PR verified by an org member that is safe to test. ready-for-human-review Indicates a PR has been reviewed by automated tools and is ready for human review
#3509 opened May 7, 2026 by redhat-ship-help Loading…
[wip] Add lean tier-2 component documentation for Sippy approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD.
#3506 opened May 6, 2026 by stbenjam Member Loading…
6 tasks
perf: test report cache priming, pagination, and query optimization approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. lgtm Indicates that a PR is ready to be merged. ready-for-human-review Indicates a PR has been reviewed by automated tools and is ready for human review
#3505 opened May 6, 2026 by stbenjam Member Loading…
TRT-2651: Sync triage description with Jira summary on bug refresh approved Indicates a PR has been approved by an approver from all required OWNERS files. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. ready-for-human-review Indicates a PR has been reviewed by automated tools and is ready for human review
#3504 opened May 6, 2026 by smg247 Member Loading…
Make BGP jobs standard do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. ready-for-human-review Indicates a PR has been reviewed by automated tools and is ready for human review
#3503 opened May 6, 2026 by tssurya Contributor Draft
Remove osde2e rosa-hcp nightly job from customizations ready-for-human-review Indicates a PR has been reviewed by automated tools and is ready for human review
#3501 opened May 6, 2026 by smarthall Member Loading…
1 task
Add ARO classic (ARO-RP) prow jobs to sippy config needs-ok-to-test Indicates a PR that requires an org member to verify it is safe to test.
#3500 opened May 6, 2026 by abiduke612 Contributor Loading…
TRT-2647: rhcos10 default for 5.0 approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. ready-for-human-review Indicates a PR has been reviewed by automated tools and is ready for human review
#3498 opened May 5, 2026 by neisw Contributor Loading…
SREP-4417: Config-driven overview customization for rosa-stage jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. ready-for-human-review Indicates a PR has been reviewed by automated tools and is ready for human review
#3465 opened Apr 23, 2026 by dustman9000 Member Loading…
5 tasks
Update pkg/api/README.md to align with current codebase ok-to-test Indicates a non-member PR verified by an org member that is safe to test.
#3407 opened Apr 6, 2026 by redhat-ship-help Loading…
Test PR Please Ignore needs-ok-to-test Indicates a PR that requires an org member to verify it is safe to test.
#3395 opened Apr 1, 2026 by dgoodwin-devin Loading…
MPIIT: Set -ibm as metal and add to Lp-Interop view
#3344 opened Mar 18, 2026 by oharan2 Contributor Loading…
Trt-1989: partition management approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#3334 opened Mar 17, 2026 by neisw Contributor Loading…
TRT-1989: remove ProwJobRunTest during partition migration approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#3333 opened Mar 17, 2026 by neisw Contributor Loading…
Partitions approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress.
#3276 opened Feb 18, 2026 by neisw Contributor Draft
WIP: add diagram that details the dataflow in component-readiness approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress.
#3262 opened Feb 11, 2026 by smg247 Member Draft
Stop updating triaged Jiras when all regressions resolve approved Indicates a PR has been approved by an approver from all required OWNERS files. lifecycle/rotten Denotes an issue or PR that has aged beyond stale and will be auto-closed.
#3139 opened Dec 3, 2025 by dgoodwin Contributor Loading…
ProTip! Add no:assignee to see everything that’s not assigned.